Stormwater Pollution Prevention Plan (SWPPP)

Drafts a Stormwater Pollution Prevention Plan (SWPPP) compliant with 40 CFR Part 122, EPA Construction General Permit (CGP), and applicable state NPDES requirements for construction projects disturbing one or more acres. Use when drafting SWPPPs, construction stormwater permits, erosion control plans, NPDES compliance documents, or BMP selection memoranda.

ID: ec86a7d9-e3e0-4e79-89b9-da0b347391f6 Version: 0.1.0 License: Apache-2.0 Author: CaseMark Language: en Added: 2026-06-15
⬇ Download

Stormwater Pollution Prevention Plan (SWPPP)

Produces a construction SWPPP covering site characterization, BMP selection, inspection schedules, recordkeeping, and operator certification under the Clean Water Act NPDES program.

Prerequisites

  1. Project details — name, location (coordinates or legal description), total disturbance acreage, timeline
  2. Operator identification — entity with day-to-day operational control
  3. Site characterization — soil types, topography, drainage patterns, existing vegetation
  4. Receiving waters — all water bodies receiving discharge, distance/direction, 303(d) or TMDL status
  5. Environmental features — wetlands, endangered species habitat, historic properties within or adjacent to site
  6. Existing permits — NPDES permit number, state CGP, MS4 requirements
  7. Site plans / grading plans — if available

Output Structure

1. Cover Page & Certifications

Element Requirement
Project name & NPDES permit # Required
Operator name, address, contact Required
Preparer name & qualifications Required
PE seal If required by state
Signature block Operator or authorized representative — name, title, date
Certification language Full 40 CFR 122.22 certification language

2. Site Description

  • Project narrative (scope, phases, timeline)
  • Total site area vs. disturbance area
  • Soil types (reference NRCS Web Soil Survey)
  • Pre- and post-construction drainage patterns
  • Receiving waters table:
Receiving Water Classification 303(d) Listed? TMDL? Distance from Site
{name} {class} Y/N Y/N {ft/mi, direction}
  • Endangered species / historic preservation eligibility determination

3. Best Management Practices (BMPs)

Organize into three categories. For each BMP, specify location, install timing, design spec, and maintenance requirement.

Erosion & Sediment Controls — silt fence, sediment basins (3,600 cf/acre or state requirement), inlet protection, stabilized construction entrances (min 50 ft × 20 ft, 6" stone), temporary seeding for areas inactive >14 days.

Good Housekeeping & Pollution Prevention

Practice Standard
Material storage Secondary containment for liquids; covered erodible materials
Concrete washout Lined, bermed, ≥10 ft from drainage; no direct discharge
Spill prevention Kits within 50 ft of fuel/chemical storage; report per state thresholds
Waste management Dumpsters covered; hazmat manifested per RCRA
Sanitary waste Licensed portable facilities; serviced weekly minimum
Vehicle maintenance Drip pans required; fluid changes only over containment

Stabilization Practices

Condition Deadline Method
Inactive areas 14 days from last disturbance (7 days if impaired water) Temporary seed, mulch, or erosion blanket
Final grade reached Per CGP (typically 14 days) Permanent seed + mulch or sod
Steep slopes (>3:1) Immediately after grading Erosion control blanket + seed

4. Inspection & Monitoring

Schedule

Trigger Frequency
Routine Every 7 calendar days during active construction
Storm event (≥0.5 in.) Within 24 hours after discharge ends
Reduced (if CGP allows) Monthly when temporarily stabilized

Inspector: Qualified person with SWPPP/BMP/CGP knowledge. States may require CPESC or equivalent.

Each inspection must document:

  • [ ] All BMPs operational and maintained
  • [ ] No off-site sediment discharge
  • [ ] Slopes and disturbed areas assessed
  • [ ] Sediment levels at basins/traps
  • [ ] Construction entrances functioning
  • [ ] Material storage properly contained
  • [ ] New discharge points identified
  • [ ] Prior corrective actions completed

Corrective actions: Initiate within 24 hours; complete before next storm or within 7 days, whichever is sooner.

5. Recordkeeping

Record Retention
Current SWPPP Permit duration + 3 years; on-site or readily accessible
Inspection reports, rainfall data, BMP maintenance logs 3 years after Notice of Termination (NOT)
SWPPP amendments (all versions) 3 years after NOT
Training records, agency correspondence 3 years after NOT

6. Amendments

SWPPP is a living document. Amend when:

  • BMPs prove ineffective
  • Site conditions change (new phases, redesign)
  • Inspections reveal new pollutant sources
  • Agency directs changes or operator changes

Log each amendment with date, description, and responsible party.

7. Personnel & Training

  • Identify SWPPP administrator by name and contact
  • All BMP personnel: initial training + annual refresher
  • Topics: SWPPP requirements, BMP installation/maintenance, spill response, reporting obligations

8. Appendices

  • A: Site maps (existing conditions, grading, BMP locations, drainage areas)
  • B: BMP detail drawings
  • C: NPDES permit / state CGP authorization
  • D: Notice of Termination (when filed)
  • E: Inspection report forms (blank + completed)
  • F: Subcontractor certifications
  • G: Endangered species / historic preservation documentation

Guidelines

  • State tailoring — CGP varies by state; confirm BMP design standards, inspection frequencies, stabilization deadlines, and reporting thresholds [VERIFY]
  • 303(d) / TMDL waters — trigger enhanced BMPs and potentially numeric effluent limits; flag prominently in site description
  • MS4 permits — check for local requirements beyond the CGP
  • Multi-operator sites — each operator needs own SWPPP or clearly defined responsibilities in shared plan
  • Do not certify — include signature blocks but operator (not drafter) must sign
  • Linear projects (roads, utilities) — use phased approach with separate BMP plans per active segment
  • Federal citations: 40 CFR § 122.26, 40 CFR § 450.21, CWA § 402 [VERIFY CGP version year against current EPA issuance]
  • Mark all state-specific citations with [VERIFY] unless user provides applicable state CGP

Comments

Loading…

Related Skills

United States flagUnited States · environmental

Toxic Release Inventory (Form R) Report

Drafts EPA Toxic Release Inventory (Form R) reports under EPCRA Section 313 and 40 CFR Part 372. Covers facility identification, chemical threshold d…

CaseMark
United States flagUnited States · environmental

SPCC Plan Drafting

Drafts a Spill Prevention, Control, and Countermeasure (SPCC) Plan compliant with 40 CFR Part 112 under the Clean Water Act. Covers facility characte…

CaseMark
United States flagUnited States · environmental

Phase I Environmental Site Assessment Report

Drafts ASTM E1527-21 environmental site assessment reports under 40 CFR Part 312. Classifies RECs, CRECs, and HRECs to establish all appropriate inqu…

CaseMark
United States flagUnited States · environmental

NPDES Permit Application

Drafts NPDES permit applications under the Clean Water Act (33 U.S.C. § 1342) for facilities discharging pollutants into U.S. waters. Covers initial,…

CaseMark
United States flagUnited States · environmental

Notice of Violation Response

Drafts formal responses to governmental Notices of Violation, covering acknowledgment, factual timeline, legal defenses, mitigation, and proposed cor…

CaseMark