Power Purchase Agreement (PPA)
Drafts U.S. power purchase agreements (PPAs) between generators and offtakers covering delivery, pricing, metering, performance guarantees, RECs/carbon attributes, credit support, defaults, and remedies. Triggers on "PPA", "power purchase agreement", "offtaker", "generator", "REC", "net output", "renewable energy offtake", "energy supply agreement", or "energy payment".
Power Purchase Agreement (PPA)
Produces a commercially balanced, regulation-aware agreement for the sale and purchase of electric energy between a generator and an offtaker.
Quick Start
Gather before drafting:
- Parties — legal names, jurisdictions, signatory authority, guarantors.
- Project — facility type, location, capacity (MW), technology, COD targets, interconnection status.
- Delivery — delivery point, ISO/RTO or utility territory, scheduling/dispatch model.
- Commercial — term length, pricing model, escalators, payment cycle, taxes.
- Attributes — REC/carbon ownership, transfer mechanics, certification requirements.
- Risk — curtailment allocation, force majeure, change-in-law, credit support, insurance.
- Operations — metering standards, testing cadence, data interfaces.
- Finance — lender requirements, step-in rights, consent rights (if project-financed).
Drafting Skeleton
1. Parties; Recitals
2. Definitions and Interpretation
3. Term; Conditions Precedent
4. Sale and Purchase; Delivery; Scheduling
5. Pricing; Invoicing; Taxes
6. Metering; Measurement; Data
7. Environmental Attributes
8. Representations and Warranties
9. Covenants; Reporting; Compliance
10. Performance Standards; Liquidated Damages
11. Events of Default; Remedies
12. Force Majeure
13. Insurance; Credit Support
14. Termination; Consequences
15. Dispute Resolution; Governing Law
16. Miscellaneous
Exhibits A–E
Core Workflow
1. Key Definitions
Define these precisely — they drive pricing, performance, and defaults:
| Term | Define |
|---|---|
| Contract Capacity | MW/kW, net of parasitic load |
| Delivered Energy | kWh/MWh measured at delivery point |
| Net Output | Adjustments for losses/auxiliary load |
| Commercial Operation Date | Objective tests and certification criteria |
| Force Majeure | Scope, exclusions, duration caps |
| Availability | Calculation formula and exclusions |
| REC/Environmental Attributes | Registry, certification, transfer mechanics |
2. Conditions Precedent
Set deadlines for each; specify consequence of non-satisfaction:
- Permits/licenses obtained and in force
- Interconnection agreement executed
- Construction milestones met; COD evidence delivered
- Insurance with required endorsements in place
- Credit support posted and accepted
- Regulatory approvals (if applicable)
3. Pricing Model
Select one and fully specify:
| Model | Key Inputs |
|---|---|
| Fixed energy price | $/MWh, escalator, start date |
| Indexed price | Index, reset frequency, floor/ceiling |
| Time-of-delivery | Peak/off-peak bands, seasonal tables |
| Capacity + energy | Capacity payment, availability test |
| Pay-as-produced | Output-based with curtailment rules |
4. Metering and Data
- Accuracy requirement (e.g., ±0.5%)
- Calibration frequency and standards
- Data delivery method and timing
- Dispute process and true-up timeline
- Loss factor allocation between POI and delivery point
5. Performance and Liquidated Damages
| Metric | Measurement | Remedy |
|---|---|---|
| Availability (% annual) | Defined formula | LDs per shortfall |
| Energy guarantee (MWh/period) | Net Delivered | LDs or make-whole |
| COD delay (days late) | Milestone dates | LDs per day |
LDs must be a reasonable pre-estimate of loss, not a penalty.
6. Default and Remedy Framework
- Cure periods by type: payment (short), non-monetary (longer), insolvency (none)
- Termination rights and effective-date mechanics
- Damages: cover costs, replacement power, termination payment calculation
- Lender step-in/cure rights (only if finance structure requires)
7. Exhibits (minimum set)
- A — Facility description, POI, single-line diagram
- B — Pricing tables, escalation schedule, example invoices
- C — Metering specs, testing protocol, data format
- D — Form notices, designated recipients
- E — Credit support forms (LOC/guarantee)
Pitfalls and Checks
- [VERIFY] jurisdiction-specific regulatory approvals, ISO/RTO tariffs, and interconnection rules before finalizing.
- Align REC/carbon transfer language with registry requirements and buyer compliance targets.
- Keep curtailment rights symmetrical or clearly allocated — avoid implied take-or-pay conflicts.
- Tie COD, availability, and performance tests to objective, auditable criteria.
- Ensure delivery point definitions are consistent across main body and exhibits.
- Match confidentiality/announcement clauses to financing and regulatory disclosure obligations.
No additional documents ship with this skill.
Related Skills
Advertising Fund Contribution Agreement
Drafts franchise advertising fund contribution agreements or addenda governing franchisee obligations to a centralized marketing fund. Trigger when d…
Area Development Agreement
Drafts Area Development Agreements granting exclusive multi-unit franchise territory rights with phased development schedules. Use when drafting area…
Bill of Lading
Drafts a U.S. ocean Bill of Lading (B/L) functioning as receipt, contract of carriage, and document of title under COGSA or Hague-Visby. Covers negot…
Bulk Sales Compliance
Drafts U.S. bulk sales compliance packages for asset purchase transactions outside the ordinary course, including UCC Article 6 jurisdictional analys…
Consulting Services Agreement
Drafts a U.S. Consulting Services Agreement covering scope, compensation (hourly, fixed, retainer, hybrid), independent contractor classification, IP…